Pureflow

Home › Bathroom Removal

Demolition & removal

The fastest part of your bathroom remodel is the part we do.

Full tear-outs down to the studs — fixtures, tile, vanities, and debris hauled out same day. Your contractor starts on a clean slate, not a mess.

We show up on timeYou get a scheduled window and a text when we are on the way.
We call you backEstimates answered the same day whenever possible — usually within hours.
We protect your propertyWork areas contained, debris hauled out, and the site left clean.
Free, no-obligation quotesClear scope and price before anything starts. No deposit to get a number.

What does a bathroom removal cover?

Everything you want gone: toilet, vanity, tub or shower, tile, drywall, flooring, and trim. We protect the rest of the house, haul the debris, and leave the room broom-clean and ready for the next trade.

What’s included

Every estimate spells out scope before any work starts.

  • Tub, shower, and surround removal
  • Vanity, toilet, and fixture tear-out
  • Tile floor and wall demolition
  • Drywall removal down to studs
  • Flooring and subfloor assessment
  • Dust containment and floor protection
  • All debris hauled away — no dumpster eyesore
  • Photo documentation before walls close
Renovation work in progress on a residential property

Tear-out done right — contained, hauled, and ready for the next trade.

Remodel-ready, not just empty

We remove to the studs cleanly so plumbers and tile setters are not working around our shortcuts.

One visit for most bathrooms

A standard full bathroom tear-out is usually a single day — debris included.

Know before we start

How to prep for a bathroom tear-out.

Plan the bathroom gap

If it's your only full bath, line up a plan before demo day — we keep the tear-out tight, but the room is out of service until the rebuild finishes.

Shutoffs and surprises

Older Lehigh Valley homes hide things: cast-iron drains, galvanized supply lines, unpermitted past work. We flag what's behind the walls before closing anything back up — photo documentation included.

DIY the easy part, not the risky part

Removing a mirror or vanity top yourself saves little and breaks more. The money is in doing the tear-out once, correctly, without damaging plumbing the next trade needs.

FAQ

Bathroom removal — common questions

How long does a bathroom removal take?

A standard full bathroom tear-out is usually a single day. Larger bathrooms, tiled floors, or load-bearing questions take longer and are flagged before we start.

Do you haul the debris?

Yes — everything we remove leaves with us the same day. No dumpster sitting in the driveway unless you ask for one.

Can you do the remodel after the tear-out?

Yes — tear-out through finish work is one of the most common jobs we take. If you have your own contractor, we leave the room broom-clean and remodel-ready for them.

Free estimate

Tell us what you need.

Tell us what's dirty, broken, or unfinished — and where. A photo of the problem usually gets you a faster, tighter answer.

610-704-5916Call or text — fastest response
Service@pureflowprowash.comEmail for commercial and recurring work
Nazareth, PAAcross the Lehigh Valley and nearby Western NJ
What needs doing?

Pick everything that applies — more than one is fine.

>Something elseDescribe it — we'll figure it out.
Who are we helping?

Then the best way to reach you.

Best way to reach you?

Last step.

Where the property is — plus anything that helps us give you a tighter number.

Optional details — timing, email, how you found us

Free estimates. No obligation. Your details are only used to answer this request.

Free estimate

Get that bathroom out of the way.

Send a few photos and your town — we'll come back with a real number and a straight answer about timing.

Call or text Free quote